Main Support Beam is Sagging, Medford, MA
3 SmartJacks will be installed under this main support beam.
Chipped Out Concrete
The crew chipped out the concrete and dug down 24".
Crushed Stone is Installed
The team pours crushed stone into the hole.
SmartJack is Placed into the Hole
The crew sets the SmartJack into the hole and preps to cover the footing with concrete.
Concrete Poured and Smoothed
Crew poured the concrete over the footing and smoothed it over.