Before & After

Bowing Cinder Block Foundation Wall Goffstown, NH

This home in Goffstown, NH had a cinder block foundation on which one side was severely bowing in due to pressure from exterior soils. At the bottom of the wall, the wall was bowed in 3-4 inches. After PowerBrace installation, the wall was almost completely flush and level, and completely stabilized.

View All Before and After Photos

our service area

We serve the following areas

MassachusettsNew Hampshire Our Locations:

Erickson Foundation Solutions
14 Clement Rd
Hudson, NH 03051
1-603-263-4404
Erickson Foundation Solutions Service Area