Cracks in Cinder Block Foundation
PowerBraces are going to mount to the floor against the half wall.
Concrete Chipped
The concrete is chipped away so the team can install SmartJacks to the main support beam.
PowerBraces Are Secured
The crew secures the PowerBraces to the floor and the ceiling.
SmartJacks Are Installed
The crew secures the footing then pours concrete over the footing to set the SmartJack in place.
