A homeowner in Tewksbury, Massachusetts, had bought a home, and the previous homeowners had the floors repaired. After 3 years, the repair the previous homeowners had installed did not last. The current homeowners decided to fix it and fix it right. They had SmartJacks and CleanSpace installed into their dirt crawlspace to eliminate the slope and also to create a moisture barrier.
A builder in Tewksbury, Massachusetts, had contacted EFS about installing new construction Helical Piers under a foundation they were pouring in a flood zone. Matt Erickson JR. designed a plan to install the Helical Piers to the new foundation when it is poured. Matt recommended installing 9 Helical Piers under the footprint of the foundation and 11 EZ Post beneath the back porch and front steps that aren't built yet. Our team used a hydraulic drive head to drive the Helical Piers and EZ Posts into the dirt until they reached sufficient pressure.
After moving into their newly purchased home, these owners wished to make several upgrades and improvements. One of the first items they needed to fix were their uneven, sloping floors. The basement was full of temporary jacks and wood columns, which were not properly supporting the floor. This before and after shows the failing column supports and the SmartJack (warrantied) which replaced them.
This homeowner in Wolfeboro, New Hampshire was experiencing water coming into their garage and causing damage to the concrete. The homeowners decided to call EFS for a free inspection.
Crew Lead Ed Nadreau and his team arrived at the home and installed 18' of FlexiSpan and 3 Crack Monitors to the cracks in the garage.
A homeowner in Wolfeboro, New Hampshire, had lived in their 1940s home for the past 4 years. Since this past August, they have noticed sagging in their main floors. The owners decided to call EFS for a free inspection of their floor system. Our Design Specialist recommended installing SmartJacks into the crawlspace beneath the main level.
The team installed 4 SmartJacks into the crawlspace with a 16' supplemental beam to lift and level the floor.