Serving Southern New Hampshire, Middlesex and Essex Counties Massachusetts
Click on a photo to enlarge.
In Methuen, MA, the homeowner faced issues with a wet crawl space and cold floors, disrupting plans for a new home office. As depicted in the before photo, moisture infiltration was evident. Erickson Foundation Solutions installed SilverGlo, TerraBlock, and CleanSpace to remedy these concerns. SilverGlo added efficient wall insulation with a vapor barrier effect, as shown in the solution photo. TerraBlock provided insulation lined perfectly to the floor while CleanSpace encapsulated the entire area. These installations effectively created a dry, insulated environment, resolving the problems and making future plans possible.
Older home with a fieldstone foundation. The lally columns and brick posts were failing and settling over the years, and so the homeowner was looking for a permanent solution to fix the problem. Erickson Foundation Supportworks installed several SmartJacks throughout the basement area, which was all dirt floor. The homeowners old sumppump was also replaced and upgraded.
A home near a lake has a high water table around their home. Recently the water has been overwhelming the old sump pump. They decided to call Erickson Foundation Solutions to inspect the basement. EFS recommended installing Water Guard, Water Guard Port, Sani Dry, Freeze Guard, and Super Sump TripleSafe.
A homeowner in Hampstead, New Hampshire, had some cracking in their basement caused by some settlement over the years. Our production team installed Push Piers in the back corner of the home to stop it from settling more.
A homeowner in Hampstead, New Hampshire, had just purchased their home and they had an inspector look at their home. The inspector noted a concerning crack in their foundation. The homeowners called EFS for a free inspection. EFS didn't find the crack to be of any concern and sealed the crack and placed a crack monitor on it. But our Design Specialist did notice a sagging beam in their garage. We recommended installing 2 SmartJacks to add support to the beam.
