Serving Southern New Hampshire, Middlesex and Essex Counties Massachusetts
Click on a photo to enlarge.
In the before photo, you'll notice the sagging floors that had our homeowner in Rollinsford, NH, reaching out for help. Concerned about the integrity of their home, they knew it was time for a permanent fix. Enter our solution: replacing inadequate temporary jacks with 6 robust SmartJacks in the dirt crawl space, as seen in the after photo. This not only stabilized the floors but remarkably achieved a half-inch lift, securing their home's structure for the future. Remarkably simple, reliably strong.
This homeowner in Greenland, New Hampshire, had seen their concrete slab sinking and cracking in the back corners. The homeowner decided to call EFS for a free inspection of their slab. Our team installed PolyLevel and NexusPro to lift and level the slab and then seal the cracks.
In the before photo from our recent project in Greenland, NH, the crawl space experienced unstable flooring issues, as seen by the ineffectiveness of temporary support posts to maintain floor stability. The homeowner contacted us to resolve this urgent problem, especially important because they planned to level the floors before improving their kitchen area. In the after photo, notice how we efficiently utilized the SmartJack® system to provide a lasting, supportive solution. This installation ensured floors were not just stabilized, but lifted to their proper elevation, successfully addressing concerns of weakened floor joists.
A garage slab in Wenham, Massachusetts had sunk. EFS came out and injected PolyLevel and NexusPro into the garage.
A homeowner in Wenham, Massachusetts, had worried about the health of themselves and their grandchildren when they visit their home. They tested their radon levels in their home and the results came back with an average of 8 pCi/L. The homeowner called EFS for an inspection of their home and our Design Specialist recommended and designed a radon mitigation system to install in their home.
Our installation team installed a radon mitigation system with 2 extraction points.